Hacker Newsnew | past | comments | ask | show | jobs | submit | AntonTrollback's commentslogin

There might have been occasions where a train ferry transported one of those train that carry cars onboard. I like that thought.


The transit version of a turducken.


Ferrtrainen?


It used be one between Denmark and Germany. Likely that one you are thinking about. Canceled due to the Fehmarn Belt bridge construction.


If that’s a new term to you, more info at https://en.wikipedia.org/wiki/Fehmarn_Belt_fixed_link. It’s a new submerged tunnel that’s being constructed between Germany and Denmark, hopefully opening in 4 years time (though that’s looking increasing unlikely at this point).

I’m looking forwards to it as it’ll nearly halve the Copenhagen <-> Hamburg train time, down to 2 hours and 20 minutes.


Meanwhile on the other side of that lovely little island:

> In 2025 when the tunnel (the Fehmarn Sound Tunnel) was still not approved by authorities it was revealed that it would not be opened in 2029 as it was then planned but in 2032, which would delay train traffic along the new connection until then. Road traffic can use the old bridge.

Source: https://en.wikipedia.org/wiki/Fehmarn_Sound_Tunnel

I would bet actual money that we (as in we Germans) don't get that tunnel done before 2035.


I've been on this train. The sound of the train being pulled onto the ferry did wake me up to say the least. It was dark outside and the blinds were shut in our sleeping coach. I remember feeling a bit of a weight, being in bed, in a closed coach, inside a large train, deep inside this massive ferry with many floors above us. It wasn't until much later that I realized that the train was open-air and not that big at all. You then wake up a few hours later near Palermo where the train runs just by the ocean – that was lovely.

I've also been on the second-to-last train of this type a few times (Snälltåget from Sweden via Denmark to Germany). That one also got canceled for the same reason – mega bridge construction (Fehmarn Belt). There, you used to get off the train to go up to the canteen for lunch with the truckers.


In the case of the Fehmarn belt it's an underwater bridge though.


I think some consider the Fehmarn Belt Fixed Link to consist of multiple parts, as the main tunnel (Fehmarn Belt Tunnel proper) is between a German island and a Danish island so stops a bit short. On the Danish side, they rebuild the Storstrøm Bridge, and on the German side they decided to build another tunnel alongside the existing Fehmarn Sound Bridge. So in total, one existing bridge, one rebuilt bridge, one short new tunnel and one long new tunnel will connect Germany proper to Denmark proper.


It was trains from Hamburg to Copenhagen used to run on the Fehmarn Ferry until the line was shut for reconstruction, they now run via Padborg.

The Snalltaget sleeper train from Berlin to Malmo used to run on the ferry from Sassnitz to Trelleborg avoiding Denmark altogether, that stopped because the ferries don't run on that route any more, and the train also runs via Padborg.


Research on governmental websites in Sweden show many of them accidentally send IP addresses to Google Analytics, breaking GDPR.

Often due because of a typos in the option string 'anonymize_ip'



I didn't spend much time on the syntax. My idea was to mimic the media queries syntax.

Media queries already kind of does this. "When screen max width is larger than xxx. Do this ..."

This idea is a extension where we can check for more than viewport width and height.


Guidelines | FAQ | Lists | API | Security | Legal | Apply to YC | Contact

Search: